Perbandingan Efisiensi Waktu dan Tenaga Kerja Menggunakan Metode Time Trade Off

  • Lasty Dinulfy Risfawany K. S. Universitas Kristen Indonesia Paulus
  • Josefine Ernestine Latupeirissa Universitas Kristen Indonesia Paulus
  • Catherine Mandoa Universitas Kristen Indonesia Paulus
Keywords: Schedule, Budget, Time Cost Trade Off

Abstract

In project implementation, there are three main aspects that need to be considered, namely adherence to schedule, expense management, and quality. The Time Cost Trade Off (TCTO) technique is one approach used to evaluate the relationship between time and expenses in construction projects. This study aims to evaluate the time and expense estimates of the project both before and after work hour extensions, as well as to analyse the time and expense estimates of the project before and after total workforce expansion. The data used in this study were obtained through direct observation involving stakeholders in the project to ensure the accuracy and relevance of the data, and will be analysed by applying the Time Cost Trade Off technique. The analysis results indicate that increasing the total workforce is more economical and efficient compared to extending work hours.

References

Aviyani, V., & Dofir, A. (2021). Analisis Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dengan Penambahan Jam Kerja dan Tenaga Kerja: Studi Kasus: Pembangunan PKL Higienis Kementerian PUPR. Jurnal Artesis, 1(2), 125-131.

Destiane, A. A., Fauzi, A., & Purnamasari, R. (2024). Perhitungan Percepatan Waktu dan Biaya dengan Metode Time Cost Trade Off (TCTO) pada Pelaksanaan Proyek Pembangunan Gedung Laboratorium dan Perkuliahan UPN “Veteran” Jawa Timur. Jurnal Teknik ITS, 13(3), D174-D180.

Gunawan, S., Handayani, F. S., & Setiono, S. (2024). Analisis Optimasi Waktu dan Biaya pada Proyek JDU SPAM Regional Wosusokas Segmen 3 dengan Metode Time Cost Trade Off menggunakan Software Primavera 6.0. Sustainable Civil Building Management and Engineering Journal, 1(2), 8-8.

Intan, S. K., Muhyi, A., & Tengku, N. M. (2018). Alternatif Percepatan Waktu Dengan Penerapan Metode Time Cost Trade Off Pada Proyek Pembangunan Jembatan (Studi Kasus: Proyek Pekerjaan Jembatan Rangka Baja Namploh Kec. Samalanga Kab. Bireuen, Aceh). Portal: Jurnal Teknik Sipil, 10(2), 19-27.

Irawan, Y. A., & Juara, A. (2022). Analisa Optimasi Biaya Dan Waktu Metode TCTO (Time Cost Trade Off)(Study Kasus: Preservasi Jalan Ruas Sp. Gunung Kemala–Sanggi). Jurnal Civil Engineering Study, 2(02), 60-66.

Latupeirissa, J. E. (2016). Metodede Perencanaan Evaluasi Dan Pengendalian Pelaksanaan Proyek Konstruksi. Penerbit Andi.

Lestari, R. (2021). Pengendalian Jadwal Proyek Isolasi Boiler Dengan Metode Time Cost Trade Off Dan Penerapan Software Primavera Di PT Athirah Gemilang Mandiri. Jurnal Optimasi Teknik Industri (JOTI), 3(1).

Maddeppungeng, A., & Suryani, I. (2015). Analisis Optimasi Biaya Dan Waktu Dengan Metode TCTO (Time Cost Trade Off). Fondasi: Jurnal Teknik Sipil, 4(1).

Mudhoffar, F., & Prafitasiwi, A. G. (2024). Pengendalian Waktu dan Biaya pada Proyek Gedung TPQ 2 Lantai dengan Metode Time Cost Trade Off (TCTO). Jurnal Teknik Sipil dan Lingkungan, 1(1), 1-8.

Nabila, F. (2023). A Analysis of Time and Cost Optimization in Building Contruction Using Time Cost Trade Off Method. Journal of Civil Engineering and Planning (JCEP), 4(2), 199-210.

Nurazizah, N., Firdasari, F., & Purwandito, M. (2023). Penerapan Metode Time-Cost Trade-Off dalam Optimalisasi Biaya dan Jadwal Proyek Laboratorium Dasar Universitas Samudra. Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi, 6(1), 94-103.

Paramitha, K. K., & Dibiantara, D. P. (2023). Analisis Percepatan Waktu dan Biaya pada Pembangunan Proyek Apartemen Kyo Society Surabaya dengan Metode Time Cost Trade Off. Jurnal Teknik ITS, 12(1), D22-D27.

Priyo, M., & Aulia, M. R. U. (2015). Aplikasi metode time cost trade off pada proyek konstruksi: studi kasus proyek pembangunan Gedung Indonesia. Semesta Teknika, 18(1), 30-43.

Priyo, M., & Paridi, M. R. A. (2018). Studi optimasi waktu dan biaya dengan metode time cost trade off pada proyek konstruksi pembangunan gedung olah raga (GOR). Semesta Teknika, 21(1), 72-84.

Ridal, R., Hakzah, H., & Misbahuddin, M. (2023). Analisis Penerapan Waktu Pada Pekerjaan Pondasi Proyek Pembangunan Jembatan Siguntu Kota Palopo. Jurnal Karajata Engineering, 3(2).

Sanjaya, A., & Dofir, A. (2023). Analisis Perbandingan Percepatan Pekerjaan Proyek Menggunakan Metode Time Cost Trade Off, Penambahan Shift, dan Fast Track: Studi Kasus Cibinong City Mall Extension. Jurnal Artesis, 3(2), 182-188.

Sari, S. N. (2023). Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off. STORAGE: Jurnal Ilmiah Teknik dan Ilmu Komputer, 2(3), 129-136.

Tangkeallo, N. V., Latupeirissa, J. E., & Tiyouw, H. C. P. (2024). Analisis Biaya dan Waktu Proyek Konstruksi dengan Metode Duration Cost Trade Off. Paulus Civil Engineering Journal, 6(4), 580-586.

Published
2025-07-31
Section
Articles